ITR Logistics and Trade DMCC
Regulation Guide ECTN

Equatorial Guinea ECTN Regulation Guide

To help avoid delays, begin the process as soon as the Bill of Lading (BL) is available. The document requirements and key country-specific points are outlined below.

Bill of Lading

For LCL shipments submitted with a House Bill of Lading (HBL), the Master Bill of Lading (MBL) may also be requested when necessary. Following the pre-validation of the certificate, a BL mentioning the shipped on board date, the place and date of issue, the certificate number is required for the final validation.

Commercial Invoice

  • The commercial invoice must name the final consignee in the destination country.
  • The applicable Incoterm must be clearly shown, together with a corresponding breakdown of values.

For example, where the Incoterm is CFR, the FOB and freight values should be stated separately.

Freight Invoice

If freight is not shown on the commercial invoice, a separate freight invoice must be provided.

Critical notes

  • Amendments requested after certificate validation are subject to an amendment fee.
  • For tariffs covering non-containerized shipments (RoRo, general cargo, or bulk), please contact our support team.

One ECTN certificate is issued electronically for each BL, and the ECTN number is issued after pre-validation. The certificate application must be finalized within 5 days from the pre-validation date. Otherwise a penalty will be imposed.

This page is the document checklist. For processing times, penalties and background on the requirement, read the full Equatorial Guinea ECTN certificate guide .

Need help with this filing?

For additional information, tariffs for non-containerized cargo, or a document check before submission, contact our support team.

All country guides